Majestic Management – Belvedere Building Envelope

This project involved the complete removal of a failed exterior envelope system as well as asbestos abatement of the entire interior with reinstatement of all finishes to new. Removal of the existing envelope included removal of the hardipanel siding, plywood behind the siding and the batt insulation within the perimeter wall stud and replace with rainscreen system with hardipanel finishd. Work included upgrading all washroom and kitchen exhaust for proper exterior exhausting, interior and exterior mold abatement, structurally upgrading balconies, new patio doors and new exterior windows. 

Interior work included the complete removal of all asbestos and mold throughout the entire building as well as conversion of the original basement pool area into two separate suites. Work completed as each suite became vacant. Total building contained 30 suites.

Client Company:

Majestic Management

Location:

Prince George, BC

Completion Date:

October 2017

Your Vision + Our Team = SUCCESS

Contact us