Careers Call Us: 1-250-649-0561

Atco Structures and Logistics Ltd. – Two Rivers Site C Waste Water

Construct new wastewater treatment ponds and gravity piping to a new disposal field to accommodate the 2200-worker camp for BC Hydro’s Site C Dam Project. 

Work included construction of 3 new wastewater cells with HDPE liner, blower building for aeration of the 3 cells, 1,500 lm of 140mm DR 26 HDPE gravity pipe to septic field, a 42,000 m2 septic field with solar powered dosing valves to 8 dosing zones via laterals. Works included graveled roadways, constructed storm pond and 550lm gravity storm pipe to ravine from pond.

Client Company:

Atco Structures and Logistics Ltd. (ATCO)

Location:

Fort St. John, BC

Completion Date:

July 2016

Your Vision + Our Team = SUCCESS

Contact us