Canfor – PG Pulp Effluent Pipe
Removal and re-install a replacement pipe for transporting bleach plant effluent to the effluent treatment area. 3185 lineal feet of 30” FRP/HDPE pipe and 2, 627 lineal feet of 8” C900 Firewater line. In plant piping tie in to header system includes stainless steel pipe, Kynar pipe, carbon steel pipe and FRP piping. Effluent pipe includes 6 rail crossings. All work occurring at operation plant requiring coordination with Canfor and CN Rail.
Client Company:
Canfor Pulp Ltd. (Canfor)
Location:
Prince George, BC
Completion Date:
July 2016