City of Prince George – Reservoir
Construction of 1 million gallon cast in place concrete reservoir, booster station and valve chamber. Installation of 250 feet of 450 mm diameter, epoxy coated, steel waterpiping and associated class 150 and 300lbs valves. Supply and installation of 3-500 hp verticle turbine pumps in booster station. Reservoir, valve chamber and booster station included 1,000 m3 of cast in place concrete. Performed all earthwork and concrete with own forces.
Client Company:
City of Prince George (COPG)
Location:
Prince George, BC
Completion Date:
March 2006