Harris Rebar Ltd. – Handling Facility
- Design-Build of a 35,000 ft2 rebar handling facility
- Complete turnkey project from development/building permit, engaging all consultants through final occupancy
- Site required extensive over-excavation to remove approximately 7,500 m3 of unsuitable material and import the same of structural gravel
- Completed with own forces all site excavation and backfill, utilities and concrete foundations
- Pre-engineered metal building and overhead crane was supplied by client with erection by IDL Subcontractor
Client Company:
Harris Rebar Ltd.
Location:
Prince George, BC
Completion Date:
September 2012