AFDE – Site C Debris Boom

Part of BC Hydro’s Site C Dam Project work included the complete civil works to facilitate the installation of the Peace River Debris Boom on both the left and right banks upstream of the dam intake location. Works include clear/grub/strip work area, construct access roads, install drainage culverts, detailed excavation, rip rap placement, cast in place concrete for left and right bank large boom anchoring points and  supply and installation of River Warning Signs at remote locations upstream and downstream of the Dam site.  Final works included assisting with equipment and labour support to boom installation contractor to enable launching and stringing of Steel debris boom structure across the Peace River.

Client Company:

AECON-FLATIRON-DRAGADOS-EBC PARTNERSHIP (AFDE) / BC Hydro and Power Authority

Location:

Site C Dam, Fort St. John, BC

Completion Date:

July 2020